My house at Malmsbury, Victoria General Information on Malmsbury Last update: 7th May, 2003 Ral Homes are the builders of the kit Land (3 acres) purchased 23rd June 1997 RAL delivered to the site on the 23 October 1999. It's nearly finished (I know I keep saying that, but I really mean it this time). I have to say it's been hard going at times, but it's great to look back and say that with the help of a few dedicated friends, we have done it ourselves. All except the stumps, which turned out to be one of the greatest problems we had. If you want a recommendation for someone to put in stumps, I'm not the person to ask.
1st September, 2002 We are building the kitchen benches at the moment. Then just a bit more painting (I love painting) a couple of doors to fit and thats it for the moment. I'm glad to say that we have finished the painting. 5th May, 2003 We have just done the wall tiles in the Kitchen.
|
|
| Outside views of the RAL-3 at Malmsbury. I'm the one doing the loading. | ![]() |
![]() |
|
![]() |
|
![]() |
|
| The very start of construction | ![]() |
| The first modules in place | ![]() |
| The wiring stage | ![]() |
| The start of framing | ![]() |
| The bathroom | ![]() |
| The painting begins | ![]() |
| What a sunset(Malmsbury) | ![]() |
| A bit of a guaze (very nasty weed) bonfire | 25/8/2002 |
| A bit of final sanding | 25/8/2002 |
| Outside view from south west | 28/8/2002 |
| Lounge room looking towards bedrooms | 28/8/2002 |
| Lounge room | 28/8/2002 |
| View to the north west (from lounge) | 28/8/2002 |
| Kitchen benches | 17/11/2002 |
|
I suppose I'm going to have to work this out? This is where the Clipsal CBus system is going to be Installed. |
17/11/2002 |
|
All the Clipsal CBus equipment Installed. One 12 channel relay module for the outdoor lighting and two 8 channel dimmer modules for the inside lights. The small module at the bottom is the PC interface. The system was Installed by Luke from Adept Electrical Group. |
29/12/2002 |
|
The CBus system with cover fitted. |
1/1/2003 |
|
Closeup view of the CBus Neo 8 way switch Installed in the lounge. |
1/1/2003 |
|
The start of Installation of the Dormer window in the Bathroom. |
23/1/2003 |
|
Inside view of the first bit of the cutout. |
23/1/2003 |
|
Outside view (I'm glad it's Greg doing the cutout, and not me). It seemed like a good idea to do this Installation after we had finished the roof. I would have to say that's it got to be easier doing it when you do the roof. |
23/1/2003 |
|
More outside views... |
23/1/2003 |
|
More outside views... |
23/1/2003 |
|
Inside view from the Bathroom with the window fitted. |
23/1/2003 |
|
Latest view of the Kitchen with the wall tiles. |
4/5/2003 |
|
Taken from the front gate. This was taken in May, 2003 |
4/5/2003 |
|
Taken from the front gate. This was taken in October, 2001 (Check out the green grass) |
29/10/2001 |
|