My house at Malmsbury, Victoria

General Information on Malmsbury

Last update: 7th May, 2003

Ral Homes are the builders of the kit

Land (3 acres) purchased 23rd June 1997

RAL delivered to the site on the 23 October 1999. It's nearly finished (I know I keep saying that, but I really mean it this time).

I have to say it's been hard going at times, but it's great to look back and say that with the help of a few dedicated friends, we have done it ourselves. All except the stumps, which turned out to be one of the greatest problems we had.

If you want a recommendation for someone to put in stumps, I'm not the person to ask.

 

1st September, 2002

We are building the kitchen benches at the moment.

Then just a bit more painting (I love painting) a couple of doors to fit and thats it for the moment.

I'm glad to say that we have finished the painting.

5th May, 2003

We have just done the wall tiles in the Kitchen.

 

Outside views of the RAL-3 at Malmsbury. I'm the one doing the loading.
 
 
 
The very start of construction
The first modules in place
The wiring stage
The start of framing
The bathroom
The painting begins
What a sunset(Malmsbury)
A bit of a guaze (very nasty weed) bonfire 25/8/2002
A bit of final sanding 25/8/2002
Outside view from south west 28/8/2002
Lounge room looking towards bedrooms 28/8/2002
Lounge room 28/8/2002
View to the north west (from lounge) 28/8/2002
Kitchen benches 17/11/2002

I suppose I'm going to have to work this out?

This is where the Clipsal CBus system is going to be Installed.

17/11/2002

All the Clipsal CBus equipment Installed. One 12 channel relay module for the outdoor lighting and two 8 channel dimmer modules for the inside lights. The small module at the bottom is the PC interface. The system was Installed by Luke from Adept Electrical Group.

29/12/2002

The CBus system with cover fitted.

1/1/2003

Closeup view of the CBus Neo 8 way switch Installed in the lounge.

1/1/2003

The start of Installation of the Dormer window in the Bathroom.

23/1/2003

Inside view of the first bit of the cutout.

23/1/2003

Outside view (I'm glad it's Greg doing the cutout, and not me). It seemed like a good idea to do this Installation after we had finished the roof. I would have to say that's it got to be easier doing it when you do the roof.

23/1/2003

More outside views...

23/1/2003

More outside views...

23/1/2003

Inside view from the Bathroom with the window fitted.

23/1/2003

Latest view of the Kitchen with the wall tiles.

4/5/2003

Taken from the front gate. This was taken in May, 2003

4/5/2003

Taken from the front gate. This was taken in October, 2001 (Check out the green grass)

29/10/2001

RAL HOMES , P.O. Box 154
Maude Street , ARARAT 3377.
Victoria. Australia.
Phone :
61-(03)-53522352